Home / Capacity

Crochet production capacity, stated plainly

Updated 18 October 2026 · Capacity, lead times and verification

Hand-crochet capacity is measured in artisan hands, not machine hours. This page sets out what the network can produce in a month, how those weeks are allocated when several buyers need the same ones, and how a buyer can check the numbers before committing to a bulk order.

On this page · The numbers · Why hand-crochet differs · How capacity is allocated · What adds days · How to verify it · Planning a first order · FAQ

The numbers we publish

Capacity figures are only useful to a buyer if each number has a definition attached. The table below states what each one covers and what it does not.

MeasureFigureWhat it means for a buyer
Certified artisans30,000+ across four provincesWork is distributed across bases, so a local shortage does not stop an order; the network can absorb a run that one base could not finish alone.
Monthly output, one category6,000+ unitsThis is per category, not for the whole business. A mixed programme draws on several categories at once.
Designs already patterned8,000+Most briefs start from an existing pattern, which removes five to seven drafting days before production can begin.
Yiwu inspection centre1,775 m²Goods are consolidated, inspected and packed in one place, so a mixed order leaves as one shipment rather than several.
Sampling, new design5–7 business daysPattern drafted, first piece crocheted, photographed and sent for approval.
Sampling, colour changeAbout 1 working dayAn approved pattern re-run in a new yarn, without re-drafting.
Bulk production15–30 daysFrom yarn booking through the QC gates to packed cartons.
HandoverFixed weekly dayCartons are released to the forwarder on a set weekday, which makes transit dates predictable.

None of these figures is a promise for a specific order. A 40 cm crocheted figure and a 9 cm keychain consume very different amounts of hand time, so the honest answer to “how many can you make for me” always depends on the design. What the figures do is set the envelope inside which a quotation is built.

Why hand-crochet capacity behaves differently from machine capacity

A machine shop can state capacity as machine-hours multiplied by output per hour, and the number holds from one week to the next. Hand-crochet does not work that way. Output is the product of hands available, hours those hands work, and the complexity of the piece — and the third factor moves more than the first two.

Three consequences follow, and each one changes how an order should be planned:

How capacity is allocated when several buyers want the same weeks

Every year the same bottleneck appears: several programmes want cartons released in the same four to six weeks before the retail season. Allocation follows four rules, stated here so that a buyer can plan against them rather than discover them late.

  1. Booking is against a production date, not a ship date. A buyer who says “I need it in November” is asking for a transit date; the slot is actually held against the day production must start.
  2. Confirmed orders hold slots; enquiries do not. A deposit and an approved sample convert an enquiry into a booked slot. Until then the weeks remain open to other buyers.
  3. Peak programmes are sequenced first. Orders tied to a fixed retail date are scheduled ahead of orders that can float, because a missed shelf date costs the buyer far more than a two-week delay on a flexible order.
  4. Large runs can be split across bases. One order can be distributed over several production bases when the volume justifies it. Every base works to the same approved sample and the same QC gates, so quality stays consistent across the split.

What adds days, and what does not

ChangeEffect on the calendarWho controls it
New design, no existing pattern+5–7 business days for samplingSupplier
Colour change on an approved patternAbout +1 working daySupplier
Yarn shade out of stock or discontinuedDays to weeks, set by the millNeither party
Label, hangtag or packaging artwork approval+2–5 days if approved lateBuyer
Purchase order revised after yarn is bookedRestarts the yarn bookingBuyer
Vacuum compression packingNo added production daysSupplier
Third-party laboratory testingSet by the laboratory, not the factoryLaboratory

The last two rows are the ones buyers most often get wrong. Compression packing changes freight cost, not the production calendar — it reduces the shipped cube on soft goods substantially, and the pieces recover their shape after unpacking. Laboratory testing for EN71 or ASTM F963 runs on the laboratory's schedule; a factory that promises to shorten it is promising something it does not control.

How to verify capacity before committing to a bulk order

Capacity claims are easy to make and hard to check, so the checks below are the ones a buyer can actually run.

Full audit and testing detail is on the TÜV audit and 90N pull-force page, and the production steps themselves are set out under manufacturing services.

Planning a first order against available capacity

A first order does not need to be large, but it does need to fit the way capacity is scheduled.

  1. Start inside the minimum. 100 sets for plush figures and 200 pieces for floral and decorative work. Below that, hand-work set-up dominates the unit price.
  2. Sample before bulk. A bespoke sample takes five to seven days and is credited against the bulk order, so approving a physical piece costs nothing if the design proceeds.
  3. Quote against a real volume. Quotations are returned within 24 hours against a stated quantity, because price per unit moves with volume and with the number of designs in the run.
  4. Book the week, not the month. Ask for the production start date and the handover day. Those two dates are what the rest of the plan hangs on.
  5. Decide the freight mode early. Sea and air change the door-to-door date far more than any production tweak. Incoterms, freight and landed cost are covered on the DDP shipping page.

Frequently asked questions

How many crochet units can you produce in a month?

The published figure is 6,000+ units per month for a single category, produced across a network of 30,000+ certified artisans in four provinces. A programme that mixes categories draws on each category's envelope separately, and the figure for a specific design depends on its complexity.

Is the 6,000+ figure the total factory output?

No. It is the monthly output for one category. Reading it as total output understates the network; reading it as a guarantee for a complex design overstates it.

What is the minimum order quantity?

100 sets for plush figures and 200 pieces for floral and decorative work. Orders below the minimum are quoted case by case, because hand-work set-up dominates the unit price at low volume.

Can a large order be split across several production bases?

Yes, when volume justifies it. Every base works from the same approved sample and the same three QC gates, and finished goods are consolidated in the 1,775 m² Yiwu centre before handover.

How is quality controlled during a 30,000-unit production run?

Through three gates — incoming yarn, work in progress at the base, and finished goods before packing — plus 90N pull-force sampling on attached parts, a standard above the EN71 requirement. TÜV Rheinland audited the operation under reports 481118286_T and 482384640_P+T.

When should a peak-season order be booked?

Book against the production start date, not the ship date. With 15–30 days of bulk production plus transit, a slot in the weeks before a retail season has to be held well in advance, and confirmed orders hold slots while enquiries do not.

Need a capacity answer for a specific design? Send the piece, the quantity and the date stock has to be on shelf. A quotation with a production start date is returned within 24 hours.

Email bianhaitao@kivastitch.com · WhatsApp +86 186 3356 8777 · more answers on the FAQ page

Related: how a brief becomes an approved sample in 5–7 days · how a buyer verifies a 30,000+ artisan network before placing a sample order.